Skip to content
Daniel HobbsElectrical

Solar PV

Solar PV installation

MCS certified solar, designed around the roof you actually have and wired by the people who install it.

Covering Thanet, Kent and the surrounding areas

Dan installs solar on ordinary houses, barn conversions and outbuildings. On roof, in roof, flat roof on ballasted or A frame mounts, and the electrical side that goes with it: inverter, isolation, protection and the connection back to the board.

The part that gets skipped elsewhere is the electrical work. A solar array is a generator wired into your house, and it is worth having the people who fit the panels also be the people qualified to connect them. That is the whole reason this business does both.

Every installation is MCS certified, which is what makes it eligible for an export tariff and what your insurer and any future buyer will want to see.

What that covers

  • Roof and site assessment
  • System design and panel layout
  • On roof mounting on tile, slate and pantile
  • In roof integrated arrays on new and re roofed properties
  • Flat roof ballasted and A frame mounting
  • Inverter installation and commissioning
  • Battery storage alongside a new or existing array
  • DC and AC isolation, protection and labelling
  • MCS certification and export application paperwork
  • Generation monitoring and handover

How a job runs

  1. Assessment

    Roof pitch, orientation, shading, structure and the state of the existing electrical installation. All four matter, and the last one is the one that catches people out.

  2. Design and quote

    A layout for your roof with the panel and inverter specified, the expected generation stated with the assumptions behind it, and a fixed price.

  3. Installation

    Scaffold, mounting, panels, then the electrical work. Most domestic installs are done inside a few days.

  4. Certification and handover

    Testing, commissioning, MCS certificate, and a walk through of the monitoring and the shutdown procedure before we leave.

Drag to compare

See the difference

Drag to compare. Frames set out first, then the panels go on.

All black solar panels laid in rows across the same felt flat roof once the array was complete.
Galvanised A frame mounts set out across a felt flat roof before the panels were fitted.

Questions

The ones that come up most

What will it save me?
That depends on your roof, your usage and your tariff, so any number given before someone has looked at the roof is guesswork. You get a generation estimate with the assumptions written down, and you can hold us to those assumptions.
Does my roof need to face south?
No. South is best, east and west arrays work and are common, and a split array across two aspects often suits how a household actually uses electricity. North facing is the one that is usually not worth it.
What is an in roof system?
The panels sit in the roof rather than on top of it, replacing the tiles underneath. It looks considerably better and it suits a new roof or a re roof, because the tiles are coming off anyway.
Can I add a battery later?
Usually yes, and it is worth saying at design stage if you are thinking about it, because it affects the inverter choice.
What does MCS certification actually do?
It is the scheme that certifies the installer and the installation. Without it you cannot get an export tariff from your supplier, and it is the paperwork a buyer or an insurer will look for.

Get a price for your job

  • NICEIC Domestic Installer
  • MCS certified
  • Renewable Energy Consumer Code
CallGet a quote