Solar PV
Roof array on a barn conversion
A long single storey roof almost entirely covered in panels, installed while the building was still scaffolded for the conversion.

A large roof with a clear run and no dormers or chimneys in the way is the easiest kind of solar job, and it makes sense to use the whole slope when you have it.
Doing the work while the scaffold was already up for the rest of the build saved a separate visit and a separate scaffold bill.
The full roof slope covered in one run.


